Repair and Maintenance Cost Estimation for Two Power Sizes of Agricultural Tractors as Affected by Hours of Use and Age in Years: A Case Study, Dongola Area, Sudan

Dahab, Mohamed H. and Gafar, Montasir A. and Rahman, Abdul Gadir M. Abdul (2021) Repair and Maintenance Cost Estimation for Two Power Sizes of Agricultural Tractors as Affected by Hours of Use and Age in Years: A Case Study, Dongola Area, Sudan. Journal of Engineering Research and Reports. pp. 113-121. ISSN 2582-2926

[thumbnail of 497-Article Text-810-1-10-20221007.pdf] Text
497-Article Text-810-1-10-20221007.pdf - Published Version

Download (370kB)

Abstract

Repair and maintenance cost is considered as one of important items for machinery management and selection especially agricultural tractors. The present study was carried out in Dongola area for tractor repair and maintenance costs estimation. The data was collected from records of Elshimalya Company for Agricultural services. Forty-four tractors representing two powers sizes, 75hp and 150hp used in the area were selected for this study. Based on the data collected, regression correlation analysis was carried out and mathematical models were derived to predict the accumulated repair and maintenance (R and M) costs as percent of purchase price in relation to accumulated hours of use and age (years) for each tractor size, and for the two sizes collectively. Five model forms (linear, logarithmic, polynomial, power and exponential) were derived and the power function was found the best fit to explain the relation. The accumulated Rand M costs as percent of purchase price (Y) was increased as the accumulated hours of use (x) and age (g) of the tractor in years were increased. A high correlation was found between the accumulated R and M cost and both accumulated hours of use and tractor age in years (Average R2 = 0.93).

It was concluded that the power function was the best fit for repair and maintenance cost estimations and this relation may be used as an average of the two tractor powers, for estimation of the accumulated R and M costs as percent of purchase price (Y) with accumulated hours of use (x) and age (g): Y=0.028x0.662 (mean) Y=12.294g1.276 (mean).

Item Type: Article
Subjects: Archive Science > Engineering
Depositing User: Managing Editor
Date Deposited: 28 Feb 2023 08:07
Last Modified: 29 Apr 2024 07:55
URI: http://editor.pacificarchive.com/id/eprint/115

Actions (login required)

View Item
View Item